Steelwork Repairs – TI, Walker Crane, Shepherds Yard

Value: £160,000

An excellent demonstration of the benefits of using rope access technicians to carryout high level welding and fabrication works has been on view at the walker crane ,shepherd offshore, Newcastle..

Total solutions direct ltd, working with by Taziker industrial, carried out the fabrication and welding of the steelworks replacements utilising rope access technicians as well as the painting we also installed the new temporary staircase and replaced the safety handrails throughout the crane. The project lasted 18 months and had a 3-6 man team throughout.

“The repairs were critical to maintain the lifespan of the 85 year old, 325 ton listed hammerhead crane and ensure productivity for the foreseeable future ” says Daniel Dickens, Director at total solutions who worked closely with Taziker industrial to deliver the project on time and on budget.